Projects in implementation:

Completed projects:

  • - IF4TM, duration: 2015 - 2018, www.if4tm.kg.ac.rs
  • - TEMPUS MAIN, duration: 2014 - 2017, www.main.uns.ac.rs
  • - Know-how Exchange on the Consequences and Challenges of  the Integration of Key Enabling Technologies in European Manufacturing for the Danube Region (DanKETwork),
  • duration: 2015 - 2016, www.isi.fraunhofer.de
  • - ERGOWORK, duration: 2013 - 2015, www.ergo-work.eu
  • -Scientific Research Cooperation between the Republic of Slovenia and the Republic of Serbia: Analysis of the Project Work and Innovation in Manufacturing Companies, Public Agency for Research Activities of the Republic of Slovenia (ARRS), Duration: 2014 - 2015
  • - Designing jobs with regard to ergonomics, duration: 01/02/2015 - 31/07/2015
  • - Study and evaluate job requirements where specific protective equipment is needed, duration: 1.4.2014 - 30.9.2014
  • - IMSS, duration: 2013 - 2014, www.manufacturingstrategy.net
  • - Research and increase in the level of development of project activity in the company Elektro Celje, d.d., coordinator Faculty of Economics and Business, Institute for Project Management, Duration: 2014
  • - Master Studies and Continuing Education Network for Product       Lifecycle Management with Sustainable Production (MAS - PLM),     Tempus, duration: 2009 - 2012
  • - Ergonomic planning of jobs in the Hella Saturnus d.o.o., duration: 2011 - 2013
  • -Product development and design of Aerospace production systems and processes in the company Veplas d.d., duration: 2009 - 2010
  • - An Innovative Web-based Tool for Self-Testing, Training and           Assessing Competencies of Project Management Professionals       (PM CAT), Leonardo da Vinci, duration: 2005 - 2007
  • - InCaS, duration: 2006 - 2010, www.psych.lse.ac.uk/incas